Adam Dalgliesh has completed fabrication of the tender tank. Today it was pulled from his fab shop and loaded onto a lorry to be taken for blasting, priming and to have a heavy duty paint coat applied to the sump and baseplate.
< Prev | Next > |
---|
Adam Dalgliesh has completed fabrication of the tender tank. Today it was pulled from his fab shop and loaded onto a lorry to be taken for blasting, priming and to have a heavy duty paint coat applied to the sump and baseplate.
< Prev | Next > |
---|